May 29th: On With the New

The roof boards had to be "cut in" to fit with the orginal end sections. This required extra time and work because building code would not permit the size of the original boards to be used. Each section had to be custom designed to fit into overlapping rows.


Once the roofing boards were inspected the roof was covered in preparation for the shingles which should be delivered at the beginning of this next week and put in place as soon as inspectors approve the previous work.