June 12: Getting Wired Up

Part of the roof covering had to be removed for inspectors in a temporary set back reflecting the difficulty involved in getting the many phases of this work coordinated. As soon as inspectors sign off on the work, the roof will be covered again and the shingles can be put in place. This will require several inspections as the tiles are put on.

A new electrical system will enable us to support a larger A/C and Heating unit and to improve the distribution of power throughout the church. Our 21st century electrical demands have far exceeded what could have been anticipated when the building was first designed over 40 years ago.